Karachi Faces Temporary Water Shortfall as K-Electric Conducts Maintenance at Dhabeji Station
Karachi, January 23, 2026: Parts of Karachi are set to experience a temporary shortfall in water supply today as K-Electric carries out essential annual maintenance at the Dhabeji Pumping Station. Read More: https://theboardroompk.com/un-high-seas-treaty-takes-effect-81-nations-commit-to-biodiversity-conservation/ The scheduled 11kV power shutdown will last approximately eight and a half hours, from 10:00 am to 6:30 pm, impacting the second and third phase pump houses. This interruption is expected to reduce the city’s overall water supply by about 60 million gallons during the maintenance period.Karachi typically receives around 650 million gallons of water per day, meaning supplies will drop to roughly 590 million gallons while the work is underway. Affected Areas and Official Advisory The disruption will primarily affect residents in Lyari, Saddar, and Chanesar Town, where water pressure and availability may be noticeably lower. Authorities from the Karachi Water and Sewerage Board (KWSB, also referred to as Water Corporation) have appealed to citizens to use water judiciously and avoid wastage during this time to help manage the reduced inflow. K-Electric emphasized that the maintenance is critical for ensuring the long-term reliability and safety of the pumping infrastructure, which is vital for the city’s water distribution system. Context of the Maintenance Work This annual shutdown is part of routine upkeep to prevent potential breakdowns and maintain efficient operations at the key Dhabeji facility, which supplies bulk water to the metropolis.No alternative power arrangements or backup measures were detailed in announcements, leaving the temporary impact as unavoidable. Residents in the mentioned areas are advised to store sufficient water in advance where possible and monitor local updates for any changes in the schedule.The maintenance is expected to conclude by evening, with normal supply levels resuming thereafter.This development comes amid ongoing challenges in Karachi’s water and power infrastructure, though this instance is planned and short-term.
